Passer au contenu de la page principale

john gray

MD
Vislock Ltd

Utility strikes on electrical cables or pipes can lead to catastrophic consequences on your large-scale construction and infrastructure projects.

It’s costly, disruptive and can even be fatal.  

Traditionally, paper-based permit to dig procedures have been in place to control the risks of excavation works. 

But this approach can lead to:

  • Human error
  • Reduced productivity
  • ‘Lost’ documentation
  • A lack of accountability

     

It doesn’t have to be this way.!

Sessions auxquelles john gray assiste

Mardi 22 Mars, 2022

Fuseau horaire: (GMT-05:00) Eastern Time (US & Canada)
11:30 AM
11:30 AM
Otto Ballintijn
Conférencier.ère
Reduct NV
CEO
12:15 PM
12:15 PM
Philip Meis
Conférencier.ère
Utility Mapping Services
Owner
1:45 PM
1:45 PM
  • Dropping the Curve
  • 1:45 PM EDT - 2:15 PM EDT  | 30 minutes
  • Digitizing and project management for infrastructure can be a complicated walled process. Leveraging Scribble Maps ca...
Jonathan Wagner
Conférencier.ère
Scribble Maps
CEO
4:00 PM
4:00 PM
Steve Slusarenko
Modérateur.rice
Subsurface Utility Map D...
Director
Lawrence Arcand
Panéliste
4 Sight Utility Engineeers
President
Wilson Philips
Panéliste
Professional Surveyors o...
Gord Reynolds
Panéliste
Infrastructure Ontario
Vice President, Commerci...