Skip to main page content

John Parker

Head of Marketing
Reveal

Elementy, w których John Parker attends

wtorek 1 marzec, 2022

Strefa czasowa: (GMT-05:00) Eastern Time (US & Canada)
9:45
9:45 - 10:00 | 15 min.

Join Jonathan Murphy, Nicholas Kellett and John Roos as they kick off the start of Winter Geo:GeoIgnite 2022.

10:00
10:00 - 10:30 | 30 min.

In this talk Dan Nord will share key insights on Maxar’s position as a centerpiece in the global tech shift from 2D to 3D. Join us to hear more about how Maxar is accelerating its Earth Intelligence business with the launch of WorldView Legion in 2022, as well as building on our lead in mapping, monitoring, and new markets of the future. 

13:00
13:00 - 13:30 | 30 min.

Abstract: Organizations are increasingly relying on geospatial analysis to power their decision making and business processes. But in such a dynamically changing world, maintaining an accurate database of critical locations is no small task. Everyday worldwide, businesses open and close, change names, or update their operating hours. When these changes happen, any map, application, or model immediately becomes stale. How can organizations strategize if they are not...

czwartek 3 marzec, 2022

Strefa czasowa: (GMT-05:00) Eastern Time (US & Canada)
10:00
10:00 - 10:30 | 30 min.

Sanjay Kumar is the founder and CEO of Geospatial Media & Communications. He also lends his time and experience to many organizations helping them to further the cause of increasing the impact of geospatial technology and its applications at a global scale.

Sanjay Kumar

Keynote speaker

wtorek 22 marzec, 2022

Strefa czasowa: (GMT-05:00) Eastern Time (US & Canada)
9:45
9:45 - 10:00 | 15 min.
10:00
10:00 - 10:30 | 30 min.

The 2012 DT-DICT (Building without destroying) reform in France aims to prevent damage to utility networks. This legislation places heavy constraints on stakeholders because it requires them to georeference all networks in the vicinity of construction work with centimetric accuracy by 2032, everywhere in the country. Patrice Lemire, CEO ...

10:45
10:45 - 11:15 | 30 min.

Albeit industry efforts, over 1 million underground utilities are annually hit around the world, with estimated damages exceeding $100 billion, not considering billions invested in technologies and inefficient processes aimed to protect utilities during earthworks operations. Available utility data is usually unreliable, and even if data is accurate, the excavator operator may still damage a utility.  

11:30
11:30 - 12:00 | 30 min.

Gyroscopic mapping of underground ducts and pipes has been around for a few decades now, and it continues to gain traction amongst the worlds' utilities as an accurate and unique technology. Nevertheless, the market perception until now is that Gyro-mapping, as it's also often referred to, is more expensive than traditional mapping and locating technologies.         And although that perception is true, it is not due to the cost of the technology, but rather...

12:15
12:15 - 12:45 | 30 min.

Arising 3-D modeling, visualization, and design software (e.g., BIM, VDC) greatly enhance advanced project designs with sophisticated risk analytics and conflict resolutions that accommodate existing infrastructure and enable proactive/predictive engineering and construction.  However, without standardized and accurate utility data, new advanced digital project delivery and damage prevention technologies are compromised...

13:00
13:00 - 13:30 | 30 min.

As the world continues to grow and urbanize, new urban infrastructure is being constructed at an unprecedented rate while old world infrastructure is being replaced and upgraded.  This has lead to a greater demand for accurate and current utility locating and mapping. This demand is further exacerbated by the fact that infrastructure construction costs continue to rise and the slightest delay or extra cost associated with insufficient utility locating has an...

16:00
16:00 - 16:45 | 45 min.

Abstract:The total cost of underground infrastructure damage in Canada during excavation work is estimated to be over $1 billion dollars annually. The primary cause of these damage incidents is the lack of reliable information on the location and other information about buried utilities and other infrastructure. The Canadian Underground Infrastructure Register project is intended to improve the current damage prevention process by providing access to reliable data t...

środa 23 marzec, 2022

Strefa czasowa: (GMT-05:00) Eastern Time (US & Canada)
10:00
10:00 - 10:30 | 30 min.

In Singapore, almost all utilities are buried underground to free up valuable above ground space for more liveable environment. These underground assets which consist of power cables, telecommunication lines, water pipes, gas pipes and wastewater networks are critical infrastructure that keep our city functioning.  Most cities have not been able to keep reliable, complete, and up-to-date maps of their underground utilities due t...

10:45
10:45 - 11:15 | 30 min.

Synopsis: The UK National Underground Asset Register has gone through rigorous pilot and preparation phases and has learned a lot about the data which we will share for 3 regions before a national roll out. However, despite all the best laid plans there will always be exceptions and unexpected scenarios which will need to either be fitted into the data model or have the data model change in order to fit them. The way in which we make these changes could make or break a project like this wh...

11:30
11:30 - 12:00 | 30 min.

Utility and energy buried pipelines represent an extensive underground network covering most of a country's territory. Their precise lateral, horizontal positioning along with their depth of cover is a critical element of any operator's GIS. It enables to deploy more accurate pipeline predictive maintenance models and avoid third party interferences. The latter being identified as one of the main causes of pipeline failures. The 2020 CGA Dirt report states that 3...

12:15
12:15 - 12:45 | 30 min.

A longstanding and unsolved problem for utility companies has been how to keep geospatial network asset data up to date as networks are extended and maintained. Currently, it can take weeks if not months for “as-built” changes to make their way back into the enterprise system of record, typically a geographic information system (GIS). Existing mobile solutions can enable workers in the field to capture data about network asset data updates, but are too time consuming and comple...

13:45
13:45 - 14:15 | 30 min.

As one of the oldest American cities, Boston holds a rich history and culture that runs not only through the streets but also beneath them. Many of the large underground infrastructure projects completed between the late 1890s and the late 1920s in Boston are still in use today. The preservation of infrastructure and the insights gleaned from the practices used to create it provide valuable lessons in how to maintain standards of excellen...

14:30
14:30 - 15:00 | 30 min.

We live in a world where the skill required to interpret maps and engineering drawings is decreasing while the density of underground networks is increasing. The result is increased collateral damage, network outages and poor health & safety outcomes for our field workers.Today, we need better ways to accurately capture and comprehend the location and nature of those networks that are out of site under our feet. AR (Augmented...

czwartek 24 marzec, 2022

Strefa czasowa: (GMT-05:00) Eastern Time (US & Canada)
14:00
14:00 - 14:30 | 30 min.

Reveal is building the world's most advanced and accurate digital twin technology for subsurface infrastructure. We're driving a safer, more efficient and sustainable world by revealing the truth of the underground.   Join us for a 30min presentation where we will be showcasing our technology through our flagship project in Wellington, New Zealand.